    彩钢板的相关安装方法
    发布来源:http://www.jnjgcg.com/  2016-11-7 10:47:59 发布人:济南坚固彩钢
    彩钢板的相关安装方法,下面来看一下:
    Color plate related installation methods, look at the following:
    1. 放样:依图面及现场实测尺寸进行放样(隔墙中心线)以两收边中心线与地面的交点弹出地轨中心线。应保证这四条线处在一个垂直面内,以保证以后安装之墙面的垂直。
    1: according to surface and field measurement lofting lofting size (partition centerline) with two receiving side of the center line and the intersection up the ground track center line. Should ensure that the four lines in a vertical plane, to ensure that the installation of the wall after the vertical.
    2. 天轨:安装要整齐,接口处须补强修齐,每隔500mm—600mm击钉或螺丝固定于水泥天花板。
    The 2 day: rail installation should be neat, the interface must be reinforcing Yin every 500mm - 600mm, hammer nails or screws in the cement ceiling.
    3. 地轨:安装地轨时要先把门的安装位置预留,尚需注意地差问题。如地面高低差太多,须整平使其落差减少,不影响调整水平,每隔600mm以击打或螺丝固定地坪上,如果地缝太大以填缝剂补满。
    3 ground rail: the installation location of the installation of the door to the first set aside, still need to pay attention to the problem. If the ground height difference is too much, to make it reduce the drop of leveling, does not affect the adjustment level, every 600mm to hit or screw on the floor, if the gap is too large to fill sealant.
    4. 收边:根据实际测量值切割收边,切割后边缘修齐。力求整齐一致,连接处要求无缝隙。与天轨及踢脚板接口处尤其注意,更要做到无缝隙。
    4 the edge: according to the actual measured value of cutting edge, cutting edge trimming. Strive to tidy and consistent, the connection place requires no gap. With the days of rail and skirting board interface with particular attention, but also to achieve seamless.
    5. 竖向龙骨:每隔49cm置一支竖向龙骨(为隔板尺寸的一半),门框两侧立柱上下完全固定,不致于摇晃,反方向增加一支竖向龙骨,门扇宽度超过90cm以上,门框上横立柱必须加强固定,必要时以焊接固定之。
    5 vertical keel: every 49cm set a vertical keel (half partition size), frame column under completely fixed, not to shake, the opposite direction increases a vertical keel, the width of the door above 90cm, cross column frame must strengthen the fixed, fixed by welding when necessary.
    6. 横向穿心龙骨:增高超过3米以上,以垂直方向1.2米置一支,当连两支衔接处必须重叠,重叠长度不得少于10cm。
    6 transverse through increased keel: more than 3 meters, 1.2 meters in the vertical direction of a branch, when even two a connection must overlap, overlapping length shall not be less than 10cm.
    7. 墙板:由一侧开始安装彩钢板,依次安装,相连板间距12mm。隔板之间采用宽度12mm压条,标准单元墙板均可互换。
    7 wall panels: from one side to start the installation of color steel plate, followed by the installation of the connecting plate spacing 12mm. The partition between the width of 12mm strip, standard cell wall can be exchanged.